Essential Terms and Charges
Everything we do, how we do it and what it costs, written down in full.
harveywjames.com/docs/essential-terms/essential-terms-v2.7.0.pdfLegal reference
The terms we work to and the fees we charge, in one place. Here are the latest edition of our Essential Terms and Charges, our full landlord fee list, and every edition from the one our website named on 1 October 2026 onwards, each with a plain-English note of what changed. Every edition is kept exactly as it was issued.
harveywjames.com/essential-termsThis link always opens this page, which shows the latest edition. For a notice or a signing pack, use the permanent link of the exact edition instead; each edition below shows its own.
The latest edition
Everything we do, how we do it and what it costs, written down in full.
harveywjames.com/docs/essential-terms/essential-terms-v2.7.0.pdfEvery landlord fee in the Essential Terms, line by line. Prices include VAT.
Every landlord uses our Standard Landlord Terms (edition 1.6, 9 November 2026), with a separate completed instruction for each property, signed by every owner through DocuSign. Read the blank agreement, Fee Schedule 1, the welcome pack and the other landlord documents before you sign. A blank copy does not appoint us. An agreement you have already signed, including one signed through Goodlord, keeps its own terms until validly changed.
Standard Landlord Terms
Your agreement with Harvey W James: the completed property instruction, the full Terms and the schedules that apply, signed through DocuSign.
Essential Terms and Charges
How the service runs day to day. For the Standard Landlord Terms it is a separate guide, not extra contract terms. An earlier agreement that incorporated an edition keeps that edition until validly changed.
Fee Schedule
Schedule 1 to the Standard Landlord Terms. The Essential Terms repeat it in Appendix A, and if the two ever differ, the Fee Schedule applies. Shown in full below. Any welcome benefit is in a separate Property Welcome Voucher, only when we expressly grant it for a property.
Fees · Essential Terms v2.7.0
Of the rent we receive each month, including VAT: our standard rate for Full Management on a sole-agency instruction.
What Full Management does not include. Full Management covers the agreed letting and tenancy work. It does not include ongoing management of your service-charge or ground-rent accounts. You remain responsible for checking demands, deadlines and payment unless we accept a specific task in writing. We promptly forward relevant bills we receive. Optional payment is first-payment-free under the applicable recorded allowance, then £10 including VAT per payment. Separately agreed account administration is £18 including VAT per hour for actual chargeable minutes, preserving applicable free time. Accepting one task does not mean taking over future bills. See ETC section 64 and Landlord Terms section 5.
These are our standard charges for new instructions from 9 November 2026. An existing signed agreement keeps its own terms until validly changed, and every earlier edition stays available, unchanged, below. For the services listed only as an amount, what each includes and how it is charged are confirmed in writing before you instruct it. If your signed agreement, or a written agreement with us, sets a different rate or charge, that agreement applies.
Harvey W James is a member of a client money protection scheme, Propertymark Client Money Protection (reference C0130307, certificate valid to 30 June 2027), and of a redress scheme, the Property Redress Scheme (membership PRS010914).
Every edition since 1 October 2026
AI summaryEach summary was written with AI from the edition’s own change log, then checked line by line against the PDFs. The PDF is the official text: if a summary and the PDF ever differ, the PDF wins. Where a summary mentions the law, it reports what that edition said when it was issued; it is not legal advice, and the law may have changed since.
About the dates. “Issued” is the date printed on the edition. “Website change history” gives the dates on which our website’s own records were changed to name the edition as current. Neither date decides by itself which edition applies to a particular agreement; see “Which edition applies to you” below.
This searches the summaries on this page, not the full text of the PDFs.
Issued: 9 November 2026Website change history: named as current from 9 November 2026 to today
An existing signed agreement, including one on Standard Landlord Terms 1.5 or one signed through Goodlord, keeps its own terms and the Essential Terms edition it names until validly changed; publishing this edition does not change it.
Sections 1, 5, 8, 16, 21, 34, 35, 63, 64 (64.3 to 64.9), 67, 68, 70, 81 and 83, new practical subsections throughout, Appendix A (rows TAR24 and TAR25) and new Appendices D to F.
harveywjames.com/docs/essential-terms/essential-terms-v2.7.0.pdf9230b6650ca9085f8cf1c0f8276d5e69af1176714dd3e28f374d61de99625419Issued: 8 November 2026Next edition: v2.7.0, issued 9 November 2026Website change history: named as current from 8 to 9 November 2026
An existing signed agreement, including one signed through Goodlord, keeps its own terms and the Essential Terms edition it names until validly changed; publishing this edition does not change it.
Sections 1, 2, 3, 5, 9, 10, 11, 15, 34.1, 44.4, 47, 49, 66, 78, 81, 84 and Appendices A to C.
harveywjames.com/docs/essential-terms/essential-terms-v2.6.1.pdfc17af035809cf01f62543acae239fa5a66baddab2697da63d60001cb39b5800dIssued: 8 November 2026Next edition: v2.6.1, issued 8 November 2026Website change history: named as current from 8 to 8 November 2026
An existing signed agreement keeps its own terms until validly changed; publishing this edition does not change it.
Sections 2, 9, 9.1, 11.2, 11.3, 11.7, 35.2, 43.1, 47.1, 58, 67.1 and Appendix A.
harveywjames.com/docs/essential-terms/essential-terms-v2.6.0.pdf4c641feadd1c1344832c9257522fe8bd99a3dc590116b30078e32f194346e9cfIssued: 23 October 2026Next edition: v2.6.0, issued 8 November 2026Website change history: named as current from 23 October to 8 November 2026
It contains all of v2.5.0’s changes.
Sections 5.1, 5.3, 34.5, 48.1 and 49.1.
harveywjames.com/docs/essential-terms/essential-terms-v2.5.1.pdfd570d7f81aef2cfb0b13df256f4c43a6ae703b79f20e519343981951f20e3d73Issued: 20 October 2026Next edition: v2.5.1, issued 23 October 2026Website change history: never named as current on its own: the website change for it was released together with v2.5.1’s on 23 October 2026
The edition itself stated a start date of 20 November 2026. v2.5.1 was issued before that date and contains all of these changes.
Sections 5, 9, 11.6, 33.1, 41.1, 44, 46 to 48, 54, 73 and 74, the FAQ and Scenarios 1, 9 and 10.
harveywjames.com/docs/essential-terms/essential-terms-v2.5.0.pdfd7343c10fc24d2baa9f53314c38c21790db217b8c6289019315487644b82f395Issued: 19 October 2026Next edition: v2.5.0, issued 20 October 2026Website change history: named as current from 19 to 23 October 2026
Still the same in v2.5.1.
Section 33.1 and the FAQ.
harveywjames.com/docs/essential-terms/essential-terms-v2.4.3.pdf0cf1bd385c69a23285d0b3bc1600e8dd038b66246e99cc6e4533c791af7ed15bIssued: 19 October 2026Next edition: v2.4.3, issued 19 October 2026Website change history: never named as current: the website moved from v2.4.1 to v2.4.3
All still in v2.5.1.
Across the document; the main ones are Sections 11.5, 11.6, 27, 28, 35.2, 42.5.1, 70.X and 81, Appendix E and the Notices & Service Guide.
harveywjames.com/docs/essential-terms/essential-terms-v2.4.2.pdf4a3b9453476268c7769dd9425aea05c3b5a091a1355deef658d275b05308475cIssued: 18 October 2026Next edition: v2.4.2, issued 19 October 2026Website change history: named as current from 18 to 19 October 2026
All still in v2.5.1.
Sections 41.1, 42.10, 42.11, 46.X, 67, 68 to 68.7, 70.X and 72, Appendices B and D, and the Scenario Index.
harveywjames.com/docs/essential-terms/essential-terms-v2.4.1.pdf79ec8b7dea3c6cc450310da3e4ded7450cea623b567d8748bbefdf96286adb4eIssued: 6 October 2026Next edition: v2.4.1, issued 18 October 2026Website change history: named as current from 6 to 18 October 2026
The “included annual health check” this edition mentions was removed in v2.4.2; everything else here is still in v2.5.1.
Sections 5, 6, 8, 10.2 to 10.4, 35.2, 39.1.1, 40.3, 46 to 49, 76 and 77, the Management and Rent Collection cards, and the Notices & Service Guide.
harveywjames.com/docs/essential-terms/essential-terms-v2.4.0.pdf1d23358724da9ed6160c1ff22412b79e9720ab55690fbf7b3d18094b0e187a11Issued: 3 October 2026Next edition: v2.4.0, issued 6 October 2026Website change history: named as current from 4 to 6 October 2026
Still the same in v2.5.1.
The Quick Reference cards.
harveywjames.com/docs/essential-terms/essential-terms-v2.3.1.pdf4bc7254a185822721f245bc8bcd035d84a1108d78d7b3a1bd8eb9bd2fef0fb05Issued: 18 September 2026Next edition: v2.3.1, issued 3 October 2026Website change history: named as current from 18 September to 4 October 2026
harveywjames.com/docs/essential-terms/essential-terms-v2.3.0.pdf0f1f38fece70c88aae7c26a55b84adb99c99432bb22b2ba061679d8b6eab487bNothing matches that. Try “keys”, “pets”, “repairs” or “deposit”, or clear the filters.
How we publish our terms
Every edition has a three-part number and the date printed on it. Its own change log calls it a patch (the last number goes up) or a minor version (the middle number goes up). A patch can still change a charge or how we work, so read the summary of each edition.
Every file here is the edition exactly as it was issued. We do not edit or replace a published file: a correction is issued as a new edition. Each file’s SHA-256 fingerprint is shown, so anyone can check that a copy is identical.
The sharing link opens this page, which always shows the latest edition. Each edition also has a permanent link to its exact file, for notices and signing packs.
This page is a record of what we issued and when. Which edition applies depends on your agreement, its incorporated documents, and whether later changes were validly made, notified and, where required, agreed. Publication alone does not change your agreement. If you need to know, ask us and we will check your signed documents. The PDF is the official text. The English edition is the reference text. Tell us about any translation difference so we can explain and correct it. A reading copy does not itself change the signed documents or remove a binding promise, liability for misleading information or your statutory rights.
“A proposed change to agreed agency fees or material obligations requires express agreement recorded in writing, at least 30 days’ written notice, and any longer or later protection in the applicable agreement. … Genuine editorial corrections that change no right, fee, service or obligation may be published in a new edition.”Essential Terms and Charges v2.7.0 · Section 81
Questions
Email us or call. If you need to know which edition applies to your agreement, we will check your signed documents.
Kept on this device — no account needed. Want to hear the moment a similar home comes up?